New construction

2017
Office and workshop decoration - Turn-key project 
VIGNAL LIGHTING - Changzhou (China)
2016
Project management on worksite for machines production 
DUCROCQ INGENIERIE PROCESS - Zhangjiagang (China)

2015

Assistance, advices and management for the construction of a plant.
STOBA - Yantaï (China)
2015
Project management for the construction of a plant.
HEIDELBERG - Shanghaï (China)

2014

Supervision of the concrete pouring for foundation performing before installation of 3 cold pilgers in production line.

CAST – AREVA - Suzhou (China)
2013
Schedule supervision - New Plant Construction (100.000 sq.m) -
TEREOS - Dongguan (China)
2011-2012
Project Management construction of a new factory 25.000 m2 -
SCHNEIDER ELECTRIC - Xiamen (China)
2010-2013
Project management for the construction of new factory 24.000 m2 -
VALINOX NUCLEAIRE - Nansha (China)
2009-2012
Management of the whole construction Project -
NEW FRENCH EMBASSY IN BEIJING - (China)
2010
Pre-study of new refurbishing of old factory and reinstallation of different production lines by writing a WHITE BOOK with all detailed work to do, writing schedule of work and calculating of budget. -
AREVA T&D - Suzhou (China)
2010
Project management of additional cooling system, fire fighting system and installation of new Chiller room in existing factory -
ALLEVARD-SOGEFI Shangha (China)
2010
Project management of Removal all factory (more than 400 machines) from old site to new site with installation, connection and restart production -
CHANGZHOU WELDSTONE WELDING COMPANY - Changzhou (China)
2009-2010
Project management of construction of extension 8.000 m2 + renovation of exiting cooling system on PDS system. -
AREVA T&D - Xiamen (China)
2008-2009
Management of new oil filling installation+ reactor project -
AREVA T&D - Shangha (China)
2008-2009
Design and Project Management Construction of 6 pits,depth 17 m improvement of the air conditioning system of a factory (8000 m2), and construction of a clean room (1000 m2)
AREVA T&D - Shangha (China)
2008
Rehabilitation of a factory area
AREVA T&D -Wuxi (Chine)
2008
Turn around management on a 10.000m2 factory and office building -
SNECMA - Guiyang (China)
2007
Project management and site supervision - Construction of High Voltage testing Laboratory -
AREVA T&D - Suzhou (China)
2007
Technical Audit on existing buildings in April 2007.
NORDON CRYOGENIE - Shangha (China)
2006
Project management - construction of a new plant (20.000 m2).
VAM - Changzhou (China)
2006
Project management and site supervision - Office building construction -
AREVA T&D - Shangha (China)
2006
Site supervision - Construction of a 20m testing tower -
CNIM - Foshan (China)
2006
Project management and site supervision - production factory enlargement -
AREVA T&D - Suzhou (China)
2005
Project management and site supervision - Construction and renovation of clean rooms - EU GMP certification -
ETHYPHARM - Shangha (China)
2005
Project management and site supervision - construction of 2 production factories -
AREVA T&D - Xiamen (China)
2005
Design and construction Management (Civil works) - Factory and offices -
ALSTOM POWER CONVERSION - Shangha (China)
2004
Project Management Mission Construction of a glass factory (23000 m2)
VETROARREDO SEDIVER (GSE) - Shangha (China)
2004
Set up of the chinese subsidiary in Shangha
AES International Consulting


Plant Transfer

 

2010
Project management of Removal all factory (more than 400 machines) from old site to new site with installation, connection and restart production -
CHANGZHOU WELDSTONE WELDING COMPANY - Changzhou (China)


Installation and commissioning

 

2014
Installation and commissioning of new production line.
TUBINDO – Batam (Indonesia)
2014
Installation of 3 cold pilgers in production line.
SMS (Germany) for CAST – AREVA - Suzhou (China)
2013
Installation and commissioning of production line in the new factory.
VALINOX NUCLEAIRE - Nansha (China)
2006-2007 Installation of machines and start of production. VAM - Changzhou (China)


Special machinery

2016
 
Project management on worksite for machines production 
DUCROCQ INGENIERIE PROCESS - Zhangjiagang (China)
2014
Study, Design and construction of conveyors, sawing and transfer machines.
TUBINDO – Batam (Indonesia)
2009-2011
Conception and construction of elevating platform to be fitted on pits for assembling cooling layers.
Conception and construction of transfer carriage.
Conception and construction of loading carriage for Kiln able to move on 2 axis.
FIVES CRYOGENIE – Taicang (China)
2009
Installation of new line for bushing fabrication including conveyors, ovens, vacuum loading platforms and testing room
AREVA - Shangha (China)
2009
Rectifying device for gold bars to make watch box
Grinding machine for watch box
Swiss watch company – (Swisserland)
2008
Pre screwing machine for coupling
VAM – Changzhou (China)